Cost

The 1997 ANAS Highways Convention estimated the cost of upgrading the A1 highway between Bologna Casalecchio and Barberino at 521 million, which has seen an increase of more than 50% if reference is made to the updated cost as at September 2013 (3.9 billion).
VARIANTE DI VALICO - updated as at 22.10.2013
Lot Length
[Km]
Intervention value (*)
[€/mln]
Casalecchio - Sasso Marconi
(Lot 0)
4,1 82,0
Sasso Marconi - La Quercia
(Lotti 1, 2, 3, 4)
19,4 546,1
La Quercia - Badia Nuova
(Lot 5A)
7,6 375,4
La Quercia - Badia Nuova
(Lot 5B)
3,3 398,3
La Quercia - Badia Nuova
(Lot 6-7)
6,6 518,8
Badia Nuova - Aglio Galleria di Base
(Lot 9-10-11)
11,2 1.041,0
Badia Nuova - Aglio
(Lot 12 and Barberino exit)
4,5 281,7
Aglio - Barberino
(Lot 13)
6,1 336,1
Other works in Italy (**) 3,0
387,1
TOTAL 65,8 3.966,6

(*) Estimate confirmed as at 30.09.2013.
(**) Inclusive of: Firenzuola Slip Road, Environmental Enhancement, Val di Setta trunk road and Porrettana trunk road, Rioveggio junction, Reno-Setta slip road and Marzabotto sewers, Phase 1 and Phase 2 not noise abating Prevam and Upgrading of the existing A1 between Aglio and the Barberino Junction and upgrading of approximately 3 km of the VS10 with an interchange between the old/new layout (Old interchange and new layout - former lot 8).
(1) Except for the electromechanical systems of the stretch, to be awarded at a later date. (2) The new Barberino junction was opened to traffic on 22.05.2007.
(3) Work on the main Marzabotto sewers, the Reno-Setta slip road and Prevam phase 1 is complete.
Work is underway on Rioveggio junction and is due to be completed in mid-2013.
Completion of the remaining work is dependant on area applications.